Enviva Gears Up For Lucedale Plant
Enviva reports that in July the Mississippi Department of Environmental Quality Permit Board unanimously approved the air permit for the proposed wood pellet plant in Lucedale, Miss., which is the principal permit required to begin construction.
In addition, Enviva continues to evaluate a potential wood pellet production plant in Epes, Alabama, along with other sites in Alabama and Mississippi, which would export wood pellets through the Pascagoula terminal.
Enviva reports that its industrial wood pellet plant in Hamlet, NC plant is now operating and expects to exit 2019 with a production run-rate of 500,000 MTPY and will reach its nameplate production capacity of 600,000 MTPY in 2021.
Enviva announced that projects to increase the aggregate production capacity of its wood pellet production plants in Northampton, North Carolina and Southampton, Virginia by approximately 400,000 MTPY are progressing, as detailed engineering is in process, major pieces of equipment are being delivered, and site preparation work is advancing. Enviva expects to complete the construction of the expansion activities in the first half of 2020 with startup thereafter, subject to receiving necessary permits.
RELATED ARTICLES:
UK Biomass Demand Rises; Enviva Reports New Japanese Contract
Enviva Considers Biomass Role In Hydrogen Economy
Finite Carbon Receives New Majority Stakeholder
Enviva, Finite Carbon Focus On Small Landowners
Enviva Reports On New Pellet Projects
Latest news
Dr. Michael Clutter, Leading Forestlands Expert
Dr. Michael Lee Clutter, who served as Dean of the University of Georgia Warnell School of Forestry and Natural Resources from 2007-2015, and was a noted expert in his field, died on December 24. He was 63…
PotlatchDeltic Sets GHG Emissions Targets
PotlatchDeltic Corp. has established a 2030 greenhouse gas (GHG) emissions reduction target for Scope 1 and Scope 2 emissions of 42% and a Scope 3 value chain GHG emissions reduction target of 25% from a 2021 baseline…
Vermeer Redesigns HG4000 Grinder
Vermeer has redesigned the Vermeer HG4000 horizontal grinder; this new generation delivers powerful performance in various wood waste recycling applications and landscaping material production. It’s equipped with a 536 HP (399.7-kW) CAT C13B T4F/Stage V diesel engine, a Series III duplex…
Find Us On Social
Subscribe to Our Newsletter
Wood Bioenergy News Online hits the inboxes of subscribers in the wood-to-energy sectors.
Subscribe/Renew
Wood Bioenergy is published and delivered worldwide 6 times per year. Free to qualified readers in the U.S. Subscribers outside the U.S. are asked to pay a small fee.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative.