Hybrid Solar-Biomass Plant Is Running

Solar biomass hybrid plant

Two 20.5 MW heaters manufactured by Sugimat for Termosolar Borges, the world’s first solar thermal-biomass hybrid plant, are operating at full capacity after successful performance tests. The plant, unique in the world due to its process conditions, is the first to combine biomass and thermosolar energy through a field of parabolic trough mirrors. Thanks to this hybridization, the plant, located in Les Borges Blanques (Lleida, Spain), provides energy 24 hours a day. In addition to the heaters, Sugimat developed the remainder of the plant’s elements in turnkey mode.

Having successfully passed the performance tests, both heaters, fed with woody biomass and with a power of 20.5 MW, are now working in hybrid mode with a field of parabolic trough solar receivers up to 390ºC.

In addition to the boilers, Sugimat developed the heat recovery systems, integral control system and emission treatment.

Hybridization of thermal solar energy with biomass increases the plant’s operating time to 150%. In this way, an unmanageable energy asset such as a solar concentration plant is transformed into a manageable one, given that the plant can continue to produce electricity at night or on days without sun. Manageable plants with renewable energy are those required to carry out the decarbonization process, complementing the strong input of photovoltaic and wind power, thus guaranteeing the stability of the system and the balance between generation and consumption.

Latest news

New From Tigercat: 6040 Carbonizer

New From Tigercat: 6040 Carbonizer Tigercat Industries has announced the official release of its 6040 carbonizer—which replaces the 6050 carbonator that Tigercat marketed for a brief time after acquiring the product through the purchase of ROI in 2019. The mobile...

Michigan’s Viking Energy Biomass Plant Still Closing

Michigan’s Viking Energy Biomass Plant Still ClosingThe Viking Energy Biomass plant in Lincoln, Mich. is closing early despite being under contract until 2027 and a recent order not to let them out of the contract, according to reports. The company is moving ahead...

Novo BioPower Gets Some Breathing Room

Novo BioPower Gets Some Breathing Room Novo BioPower CEO Brad Worsley says the Salt River Project and Arizona Public Service have signed contracts through 2033 to buy electricity generated by burning biomass. Snowflake biomass plant is the only one in the state large...

Find Us On Social

Subscribe to Our Newsletter

Wood Bioenergy News Online hits the inboxes of subscribers in the wood-to-energy sectors.

Subscribe/Renew

Wood Bioenergy is published and delivered worldwide 6 times per year. Free to qualified readers in the U.S. Subscribers outside the U.S. are asked to pay a small fee.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative.