Pinnacle, Westervelt, Two Rivers Come Together

Pinnacle Renewable Energy plans to build an industrial wood pellet production facility in the Southeast U.S. at Demopolis, Ala., in close proximity to its Aliceville, Ala. facility. The new mill will be located adjacent an existing large sawmill in Demopolis.

The Demopolis facility is expected to have annual production volume of 360,000 metric tons. The Demopolis facility will operate under a single partnership with Pinnacle, The Westervelt Company (TWC), and Two Rivers Lumber (TRL) holding a 70%, 20% and 10% interest, respectively.

The Demopolis facility is in the final stages of design and construction planning. Long-term fiber supply agreements have been completed with the majority of suppliers, including Westervelt and Two Rivers Lumber, which has built a new sawmill at Demopolis that will supply the new pellet mill.

RELATED ARTICLES:

Pinnacle Renewable Energy To Be Acquired By Drax Group

Pinnacle Names Duncan Davies As CEO

Pinnacle CEO Rob McCurdy Is Retiring

Latest news

Hybrid Solar-Biomass Plant Is Running

Two 20.5 MW heaters manufactured by Sugimat for Termosolar Borges, the world’s first solar thermal-biomass hybrid plant, are operating at full capacity after successful performance tests. The plant, unique in the world due to its…

Peak Renewables To Build In BC

Peak Renewables reports it is building a 600,000 tonne per year industrial wood pellet facility in Fort Nelson, British Columbia. Fort Nelson First Nation will reportedly have equity in the plant, which is anticipated to be in operation…

Find Us On Social

Subscribe to Our Newsletter

Wood Bioenergy News Online hits the inboxes of subscribers in the wood-to-energy sectors.

Subscribe/Renew

Wood Bioenergy is published and delivered worldwide 6 times per year. Free to qualified readers in the U.S. Subscribers outside the U.S. are asked to pay a small fee.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative.