Peak Renewables Plans Alabama Wood Pellet Facility
Canadian-based Peak Renewables plans to build a 180,000 metric tons per year wood pellet mill in Dothan, Ala. The $30 million project will utilize residuals from Rex Lumber sawmills in the area.
Construction on the facility is expected to be completed by mid-2023. Peak is building the plant adjacent the SmartLam cross laminated timber plant in Dothan.
SmartLam recently announced it will add a $50 million glulam plant at its Dothan site. It will be capable of producing 84MMBF annually at full production.
Latest news
MoistTech IR3000-W Series Sensors
MoistTech Corp.’s IR3000-W series moisture sensors feature cutting-edge NIR (near-infrared) technology achieves unparalleled accuracy, delivering true, repeatable results year after year with little or no maintenance—just accurate and reliable moisture analysis of wood products, including those used in bioenergy production. The amount of moisture in wood products is a critical concern of the forest industry because excess moisture can have a large impact on final product quality, production, and energy efficiency. In addition, the IR3000-W reduces fire and explosion risk, prevents press explosions, offers precise dryer control, and monitors blending for control of moisture and resin in wood products.
Find Us On Social
Subscribe to Our Newsletter
Wood Bioenergy News Online hits the inboxes of subscribers in the wood-to-energy sectors.
Subscribe/Renew
Wood Bioenergy is published and delivered worldwide 6 times per year. Free to qualified readers in the U.S. Subscribers outside the U.S. are asked to pay a small fee.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative.