Greenvolt, Equitix acquire 46.3 MW Biomass Power Plant
Portuguese-based Altri’s wholly-owned subsidiary, Greenvolt–Energias Renovaveis, has entered into an agreement with British-based Equitix Group to acquire Tilbury Green Power Holdings. Tilbury Green Power owns a fully operational biomass power plant with a net design capacity of 46.3 MW located in the port of Tilbury, Essex, UK. Ownership will be split between the firms, with Greenvolt taking 51% and 49% going to Equitix. The transaction is valued at £246.5 million (over $349.3 million).
Tilbury Power Plant is located around 25 miles from central London and is, therefore, strategically located to process waste wood for the area, with few alternatives in the vicinity. Its design is based on conventional grate and boiler technology and plays a key role in meeting the UK’s climate goals by providing renewable baseload capacity.
The plant is considered one of the UK’s highest-specification plants concerning fire and deflagration protection systems, according to Altri. It benefits from long-term contracts covering all key operational areas; a stable and highly visible cash flow generation, with a remuneration framework underpinned by RPI-indexed ROCs through to 2037; and useful life until 2054. Supply is covered by a 16-year fuel supply agreement covering 100% of the plant’s needs.
This agreement will allow Greenvolt, supported by Equitix, to follow its ambitious goal of international growth, solidifying its position in the European renewable energy sector.
Latest news
Drax Announces $50 Million Expansion In Aliceville
On the heels of a recent study published by Drax showing the company could contribute more than a quarter billion dollars to Alabama’s economy in 2023, the company has announced a $50 million investment at its Aliceville pellet plant. This investment will increase production capacity by nearly 50%, from…
Washington Carbon Offset Developer ‘Steps Away’ From Project
A company that had been working with the Washington state Dept. of Natural Resources (DNR) to help develop a state program to sell carbon offsets as a way to generate forest revenues has stepped away from the project, citing the…
Enviva Plants Longleaf As Part Of NC Forest Restoration Project
Enviva has partnered with the Sandhills Prescribed Burn Assn. and Milliken Advisors to sustainably thin the loblolly pine on over 500 acres of Hoke Community Forest in preparation for the establishment of a longleaf pine savannah in North Carolina. On Saturday, December 3, 2022, more…
Find Us On Social
Subscribe to Our Newsletter
Wood Bioenergy News Online hits the inboxes of subscribers in the wood-to-energy sectors.
Subscribe/Renew
Wood Bioenergy is published and delivered worldwide 6 times per year. Free to qualified readers in the U.S. Subscribers outside the U.S. are asked to pay a small fee.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative.