Greenvolt, Equitix acquire 46.3 MW Biomass Power Plant

Portuguese-based Altri’s wholly-owned subsidiary, Greenvolt–Energias Renovaveis, has entered into an agreement with British-based Equitix Group to acquire Tilbury Green Power Holdings. Tilbury Green Power owns a fully operational biomass power plant with a net design capacity of 46.3 MW located in the port of Tilbury, Essex, UK. Ownership will be split between the firms, with Greenvolt taking 51% and 49% going to Equitix. The transaction is valued at £246.5 million (over $349.3 million).

Tilbury Power Plant is located around 25 miles from central London and is, therefore, strategically located to process waste wood for the area, with few alternatives in the vicinity. Its design is based on conventional grate and boiler technology and plays a key role in meeting the UK’s climate goals by providing renewable baseload capacity.

The plant is considered one of the UK’s highest-specification plants concerning fire and deflagration protection systems, according to Altri. It benefits from long-term contracts covering all key operational areas; a stable and highly visible cash flow generation, with a remuneration framework underpinned by RPI-indexed ROCs through to 2037; and useful life until 2054. Supply is covered by a 16-year fuel supply agreement covering 100% of the plant’s needs.

This agreement will allow Greenvolt, supported by Equitix, to follow its ambitious goal of international growth, solidifying its position in the European renewable energy sector.

Latest news

New From Tigercat: 6500 Chipper

New From Tigercat: 6500 ChipperTigercat has officially launched 6500 chipper after more than a year of successful field operations involving multiple retail units. The 6500 is a heavy-duty down-swing drum chipper designed for high production and maximum flexibility....

Colorado Biomass Power Plant Set For Auction

Colorado Biomass Plant Set For Auction Eagle Valley Clean Energy in Gypsum, Colo. filed for bankruptcy in spring 2024, after the facility closed abruptly in November. Officials report an Illinois real state company has the leading bid to acquire the facility and will...

Marubeni Starts Up Japanese Power Plant

Marubeni Starts Up Japanese Power Plant Officials with Marubeni Corp. recently announced the completion and startup of its new biomass power plant in Tahara City, Aichi Prefecture, Japan, as of late November. The wood-fired Aichi Tahara Biomass Power Plant has a 74 MW...

Find Us On Social

Subscribe to Our Newsletter

Wood Bioenergy News Online hits the inboxes of subscribers in the wood-to-energy sectors.

Subscribe/Renew

Wood Bioenergy is published and delivered worldwide 6 times per year. Free to qualified readers in the U.S. Subscribers outside the U.S. are asked to pay a small fee.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative.