Drax Adds Rail Link

A one-year-old rail link has increased capacity to deliver more sustainable biomass from Drax’s LaSalle BioEnergy pellet plant in Urania, La., to its UK power station. The $15 million rail link, combined with other initiatives, have already contributed to a $5/tonne reduction in Drax’s biomass production costs in 2019.

The five miles of rail track connects Drax’s LaSalle BioEnergy pellet plant to the regional rail network, enabling freight trains to deliver the pellets to the company’s dedicated export facility at the Port of Greater Baton Rouge. The addition of the rail link has allowed Drax to deliver around 7,000 tonnes of sustainable biomass to the Port of Greater Baton Rouge in each train, compared to just 27 tonnes that could be transported by each truck previously.

A team of close to 40 contractors worked through two of the wettest Louisiana winters in decades to clear the site, excavating around 180,000 cubic yards of dirt to level off the ground and stabilize it before three sets of rail tracks could be laid. The work also included installing conveyors to get the pellets to the new rail loading point.

The rail link was commissioned last May and is now fully operational—and is part of Drax’s wider efforts to cut the costs of its biomass by around a third by 2027.

RELATED ARTICLES:

Drax Announces $40M Investment In Arkansas

Drax Sets Sights On Carbon Capture

Pinnacle Renewable Energy To Be Acquired By Drax Group

Earthworm, Drax Working Together

Drax Can See End Of Coal Operations

Drax Appoints White To Lead U.S.

Latest news

Valmet Suppling Automation To Korean Biomass Plant

Valmet will supply a Valmet DNA distributed control system (DCS) to Gwangyang Green Energy Corp.’s biomass power plant under construction in Southwest Province in South Korea. The order was placed by Lotte Engineering and Construction Co., Ltd (Lotte E&C), which is the engineering, procurement, and construction (EPC) contractor for the plant…

Mote Second Biomass To Hydrogen Project Announced For California

Mote Inc. has received $1.2 million in grant funding from the U.S. Forest Service, the California Department of Conservation, and the California Department of Forestry (CAL FIRE) to establish its second biomass to hydrogen and carbon sequestration plant in partnership with the Sacramento Municipal Utility District (SMUD). As Mote’s hydrogen offtake partner for the second facility in…

Player Design Inc. Key Supplier, Engineering Firm For Newly Announced Delta Biofuel Renewable Fuel Facility In Louisiana

Delta Biofuel has announced a $100 million final investment in the construction and start-up of a full-scale renewable fuel production facility pelletizing sugarcane waste in Jeanerette, La., with annual production estimated at 340,000 metric tons of bagasse pellets. Player Design Inc. (PDI) has been selected to provide two PDI 17 ft. x 70 ft. dryers (each with a 100 million BTU/hour furnace)…

Find Us On Social

Subscribe to Our Newsletter

Wood Bioenergy News Online hits the inboxes of subscribers in the wood-to-energy sectors.

Subscribe/Renew

Wood Bioenergy is published and delivered worldwide 6 times per year. Free to qualified readers in the U.S. Subscribers outside the U.S. are asked to pay a small fee.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative.