Bandit Celebrates Expansion With Ribbon Cutting

Bandit Industries, Inc. celebrated the acquisition of a facility in Mount Pleasant with a ribbon cutting ceremony on April 5th. This facility, formerly owned by Burch Tank, is situated on twenty-four acres with 60,000 sq. ft. of manufacturing space.

“These buildings and this property will be so instrumental in growing our company as we continue to ramp up to meet the growing demand for our products,” stated Bandit’s CEO Jerry Morey during his onsite speech at the ceremony. The goal of this location is to draw employees from a further distance away to accommodate the current need for new employees. The proximity to the highway also serves as an additional convenience for accessibility.

Currently, the location includes Bandit’s electrical team, consisting of wiring harnesses for all Bandit products, as well as production of components for the whole tree chipper and horizontal grinder product lines. Future plans include moving the rebuild department from the main headquarters—which specializes in the refurbishment and service of existing Bandit machines. “The primary facility of this site is ideal for producing one of our major product lines, we will be adding a new paint room before we move a line here,” Morey added.

A variety of attendees ranging from Bandit employees, community members, elected officials, and more showed up for the ceremony and spoke at the event. Local Mount Pleasant radio station 95.3 CFX was also live on location and promoted current job opportunities.

2023 marks Bandit’s 40th anniversary, and became an employee-owned company (ESOP) in 2018. During his speech, Morey briefly talked about how Bandit became an ESOP, “we initially looked at selling to another manufacturing company and then an investment banking company, but backed out of those offers over concerns for our employees and the future of the company.” Over the next couple of years, Bandit will likely need an additional 200 employees and hope to fill 95 open positions by the end of 2023.

In addition to the new Mount Pleasant facility, Bandit invested an additional $14 million throughout 2022, conducting several expansions at their main campus, including adding a new 80,000 sq. ft. steel room with new cutting and machining equipment and robots. When added together, the total manufacturing space across all Bandit locations equals 560,000 sq. ft.

Latest news

Strategic Biofuels Partners With Sumitomo Corp.

Strategic Biofuels, which seeks to be a leader in developing negative carbon footprint renewable fuel plants, and Sumitomo Corp. of Americas (SCOA), a subsidiary of Sumitomo Corp., a leading global trading and business investment company dedicated to sustainability, have entered into a Joint Development Agreement for the Louisiana Green Fuels (LGF) project at the Port of Columbia in Caldwell Parish, La.

read more

MoistTech IR3000-W Series Sensors

MoistTech Corp.’s IR3000-W series moisture sensors feature cutting-edge NIR (near-infrared) technology achieves unparalleled accuracy, delivering true, repeatable results year after year with little or no maintenance—just accurate and reliable moisture analysis of wood products, including those used in bioenergy production. The amount of moisture in wood products is a critical concern of the forest industry because excess moisture can have a large impact on final product quality, production, and energy efficiency. In addition, the IR3000-W reduces fire and explosion risk, prevents press explosions, offers precise dryer control, and monitors blending for control of moisture and resin in wood products.

read more

New From Bandit: HM6420 Hammermill Grinder

This highly productive 40 in. capacity grinder is designed and manufactured to be an alternative solution for those grinding applications that may contain contaminants. A Caterpillar C32, 1,200 HP engine provides ample torque and horsepower for optimal machine performance and productivity…

read more

Find Us On Social

Subscribe to Our Newsletter

Wood Bioenergy News Online hits the inboxes of subscribers in the wood-to-energy sectors.

Subscribe/Renew

Wood Bioenergy is published and delivered worldwide 6 times per year. Free to qualified readers in the U.S. Subscribers outside the U.S. are asked to pay a small fee.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative.