Posts tagged with
Albany

Georgia Power to Delay Plant Mitchell Conversion

With the uncertainty of how future EPA regulations might affect industrial boiler emissions, Georgia Power has decided to delay the biomassĀ conversion of coal-fueled Plant Mitchell in Albany, Ga., until the EPA rules are better defined in April 2010. The anticipated industrial boiler Maximum Achievable Control Technology rule, or “IB MACT,” would regulate emissions of hazardous [...]

Subscribe

Looking to subscribe to Wood Bioenergy magazine? It's simple, just follow the link to our online subscription form and complete the required fields and submit. If you'd rather talk to a real live human being, feel free to give us a call at (800) 669.5613'

Contact

To contact Wood Bioenergy magazine, either call (334) 834-1170 or email us at contact@woodbioenergymagazine.com

TAG CLOUD