Longview Fibre Plans Biomass Plant Construction

Washington-based Longview Fibre Paper and Packaging Inc. has announced plans to build a 65-megawatt biomass plant, estimated at $100 million. Longview Fibre hopes to have the plant operational in about two years. The plant is expected to burn around 38,000 tons of wood chips, hog fuel, and sawdust monthly.

Washington-based Longview Fibre Paper and Packaging Inc. has announced plans to build a 65-megawatt biomass plant, estimated at $100 million.

Longview Fibre hopes to have the plant operational in about two years.

The plant is expected to burn around 38,000 tons of wood chips, hog fuel, and sawdust monthly.

Tags: , , ,

POST A COMMENT

Your email is never published nor shared. Required fields are marked *

*
*

Subscribe

Looking to subscribe to Wood Bioenergy magazine? It's simple, just follow the link to our online subscription form and complete the required fields and submit. If you'd rather talk to a real live human being, feel free to give us a call at (800) 669.5613'

Contact

To contact Wood Bioenergy magazine, either call (334) 834-1170 or email us at [email protected]

TAG CLOUD